Requirements and load assessment
Review the available building information, identify assumptions and assess the cooling and ventilation requirements within the agreed scope.
Bring comfort, airflow, equipment selection and practical space requirements into one coordinated mechanical design.
Discuss this service ↗Scope and availability confirmed for each engagement
A building’s HVAC system needs to respond to how the space will actually operate. The starting point is the brief: location, envelope, occupancy, operating hours, internal gains and the expectations of the owner and project team. Henvair’s proposed design service develops these requirements into a clearly documented system approach, rather than treating equipment selection as an isolated purchasing decision.
The design discussion considers the relationship between cooling, outdoor air, exhaust, air distribution and maintenance access. For an existing fit-out, available system capacity and landlord interfaces also need to be established. A design basis records the inputs and assumptions so that decisions can be reviewed when the architecture or operating requirements change.
Suitable for early system planning, commercial fit-outs and mechanical design development. Cleanrooms and industrial facilities require a separate discussion of process loads, environmental requirements and specialist interfaces before scope is accepted.
Review the available building information, identify assumptions and assess the cooling and ventilation requirements within the agreed scope.
Discuss suitable system approaches, space zoning, operating patterns and the implications for equipment locations and distribution routes.
Develop preliminary equipment selections and mechanical layouts in conversation with the architect and other disciplines.
The final list is agreed for your project and may include:

A reliable starting package helps identify the right scope and any outstanding information.
Confirm the project stage, available inputs and outstanding information.
Agree the requirements, assumptions and boundaries of the design.
Evaluate the system and prepare the commissioned calculations and layouts.
Respond to agreed comments and issue the defined deliverables.
Installation, procurement, commissioning, statutory approval and performance certification are separate responsibilities unless specifically agreed. Equipment availability and final vendor selections need confirmation during the project.
Yes. Early discussions are useful for comparing system approaches before a selection limits the layout or creates coordination difficulties.
No. System choice depends on the brief, building constraints, climate, operation and project priorities. It is reviewed for the individual engagement.
Share the project location, available drawings and the support you need.